RACERS: Note an obstruction to look for when entering the harbor in the dark.
SOLOMONS HARBOR – MARINE CONSTRUCTION PROJECT
Mariners are advised that a bulkhead replacement project is scheduled to occur in Solomons Harbor from July 7, 2014 through October 31, 2014,
Monday through Thursday, from 6 a.m. to 6 p.m. The project is located along the University of Maryland Biological Laboratory Research Fleet
Operations bulkhead at Solomons Island, MD. Two work barges will be placed abreast along the northeast side of the bulkhead, in approximate
position latitude 38°19’12.84” N, longitude 076°27’05.70” W. The barges will remain in position at all times and will be lighted at night. The
waterway is expected to be restricted approximately 100 feet. Mariners are urged to use caution when transiting the area. Charts 12264,
12284.
This Post Was Modified: Jul 02, 2014 21:34 EST
|